

OEM &
Custom Panel Manufacturing
Technical Due Diligence
Your brand. Our production line in Ras Al Khaimah.
An independent read of the project before the money moves.

Technical Due Diligence
Technical Due Diligence
An independent read of the project before the money moves.
An independent read of the project before the money moves.

what is it
what is it
what is it
Technical review for investors, lenders and buyers
Technical review for investors, lenders and buyers
Is the design sound, will the plant produce what the model assumes, are the contracts and permits in order, and what risks have not been priced. Reviewed by a team that builds and operates plants, not only reads about them.
what is it
Technical review for investors, lenders and buyers
Is the design sound, will the plant produce what the model assumes, are the contracts and permits in order, and what risks have not been priced. Reviewed by a team that builds and operates plants, not only reads about them.
What are the advantages
What are the advantages
What are the advantages
A report your investment committee can use
A report your investment committee can use
1. Operator's view
Reviewed by people who build and run plants.
2. Yieldverified
P50 and P90 re-run, not accepted as given.
3. Contracts read
EPC, O&M and PPA terms reviewed against technical reality.
4. Committee forma
Structured as the paper your committee expects.

What are the advantages
A report your investment committee can use
Design and approvals, supply of modules and balance of system, civil and electrical works, testing, commissioning and handover — delivered under a single contract with a single guarantee. Rooftop, ground-mount, car park and facade projects, with the modules coming from our own line rather than from a sub-contract.
How it works
How it works
How it works
4 steps from data room to red-flag report
4 steps from data room to red-flag report
4 steps from data room to red-flag report
01
01
01

Data room review
Data room review
Data room review
Document request list, completeness check, first findings.
Document request list, completeness check, first findings.
Document request list, completeness check, first findings.
02
02
02
Site inspection
Site inspection
Site inspection
Visual, thermal and electrical inspection of the plant or the site.
Visual, thermal and electrical inspection of the plant or the site.
Visual, thermal and electrical inspection of the plant or the site.


03
03
03
Design and yield
Design and yield
Design and yield
Design review, equipment assessment, independent yield run.
Design review, equipment assessment, independent yield run.
Design review, equipment assessment, independent yield run.
04
04
04
Contracts and permits
Contracts and permits
Contracts and permits
EPC, O&M, PPA, grid and permit compliance.
EPC, O&M, PPA, grid and permit compliance.
EPC, O&M, PPA, grid and permit compliance.

What the report contains
What the report contains
The contents page
The contents page
Item
Detail
Executive summary
Verdict and conditions on one page
Design review
Layout, electrical design, structural and mounting
Equipment assessment
Modules, inverters, trackers — quality and bankability
Yield assessment
Independent P50 and P90 with assumptions stated
Construction review
Schedule, workmanship, snag list where applicable
Contract review
EPC, O&M and PPA terms against technical reality
Permits and grid
Compliance status and open items
CAPEX / OPEX benchmarking
Against regional market figures
Risk register
Ranked, with mitigation and cost impact
Recommended actions
Conditions precedent and follow-up items
أداة التكوين
حدّد مشروعك
الخدمات
الموارد
اشترك في نشرة فايرس
© 2026 فايرس. جميع الحقوق محفوظة.
زاخ للطاقة المتجددة والتصنيع الهندسي FZ-LLC
أداة التكوين
حدّد مشروعك
الخدمات
الموارد
اشترك في نشرة فايرس
© 2026 فايرس. جميع الحقوق محفوظة.
زاخ للطاقة المتجددة والتصنيع الهندسي FZ-LLC
أداة التكوين
حدّد مشروعك
الخدمات
الموارد
اشترك في نشرة فايرس
© 2026 فايرس. جميع الحقوق محفوظة.
زاخ للطاقة المتجددة والتصنيع الهندسي FZ-LLC




